Tuesday, January 22, 2013

Occupancy!

Party Room interior with stages / bar
Party Room interior, steps lead to Women's and Men's room
Willie Alexander Room with tables / benches
Willie Alexander Room with newly installed signage

Tuesday, January 8, 2013

Substantial Completion / Phase 2 Punchlist

Preston Place facade with south addition
Preston Place with site work complete and landscaping installed
South addition / front lawn
New patio and railing
Grady Ave facade with sunken courtyard access to Entertainment Room
Entertainment room with epoxy floor and completed bar
Sunken courtyard / patio from upper patio (outside of Willie Alexander Room)
Willie Alexander Room
Grand Foyer at second floor
East addition hallway off Grand Foyer
East Addition, South Bedroom (Wine)
East Addition, Middle Bedroom (Name TBD)
East Addition, North Bedroom (Cayenne)
South Addition, East Room (Blue)
South Addition, West Room (President's Room / Orange)
Stair B with access down to Entertainment and up to Willie Alexander; former coal chute on lower wall

Sunday, December 30, 2012

Exterior Progress


Additional handrail at top of seating area
Additional handrail at perimeter of patio

Guardrail / handrail complete
Site signage in place

Monday, December 3, 2012

OAC 15: Getting close!

New entrance at Preston Place / progress on the exterior cornice paint prep
South Addition; grading at patio underway
South Elevation with curb cut prepartion
East elevation with asphalt in place on driveway
Party room entrance / patio access stair; progress on the amphitheater seating at sunken courtyard
Exterior stair outside of Party Room entrance
Party room interior (at sunken courtyard entrance)
Party room from bar
Willie Alexander Room / Dining; progress on the sliding doors into Chapter room
View of patio from Roof Deck (outside of Willie Alexander Room)
East Addition - Second floor hallway with wood floor
South bedroom (facing Grady Ave / sunken courtyard) 



Friday, November 16, 2012

OAC 14: Exterior concrete / drywall progress

South elevation (from Grady Ave)
Concrete stairs down to sunken courtyard and up to patio
Amphitheater seating currently being formed / poured
Looking south (to Grady from ground floor porch)
Ground floor porch over entertainment room extension

Porous concrete poured at north parking area
Entertainment room (looking south to sunken courtyard) interior
Dining room (looking south to porch) interior
South porch interior