Sunday, October 21, 2012

OAC Meeting 12 - South addition takes shape

Framing starts to take shape on the South Addition
Second floor framing of east addition is compete and windows have been installed
The south porch takes shape; the new at-grade patio will be approximately 18" below the porch finished floor
Curbing has been installed along house

=

Tuesday, October 2, 2012

OAC Meeting 11 - Framing Progress


View from Grady: Ground floor mixed use room is framed; second floor joists are in place

Porch: Looking east towards Pi Phi over party room extension

Mixed Use: Looking south (towards Grady Ave); large opening will have outswing french doors to porch
Mixed Use: Looking north (towards Sigma Chi); doorway to stair beyond
Party Room: Looking north (towards bar area) with door to storage under stairs
Party Room: Looking south (toward courtyard); large opening to receive outswing french doors
Second Floor: New entrance to Grand Foyer currently infilled with fire rated wall to separate Phase 1 / Phase 2