![]() |
| Framing starts to take shape on the South Addition |
![]() |
| Second floor framing of east addition is compete and windows have been installed |
![]() |
| The south porch takes shape; the new at-grade patio will be approximately 18" below the porch finished floor |
![]() |
| Curbing has been installed along house |
=




No comments:
Post a Comment