Friday, November 16, 2012

OAC 14: Exterior concrete / drywall progress

South elevation (from Grady Ave)
Concrete stairs down to sunken courtyard and up to patio
Amphitheater seating currently being formed / poured
Looking south (to Grady from ground floor porch)
Ground floor porch over entertainment room extension

Porous concrete poured at north parking area
Entertainment room (looking south to sunken courtyard) interior
Dining room (looking south to porch) interior
South porch interior

Friday, November 2, 2012

OAC 13: Window Installation!



Progress from Grady Ave; framing for both additions is complete
New south porch addition with windows installed
Concrete formwork in place for the new sunken courtyard and amphitheater seating
Looking east into the sunken courtard and future stairs to the east parking area
Concrete for porch in place
North parking area with gravel in place; porous concrete for the parking area will be poured in the upcoming week.  Note, the HVAC condensing unit will be relocated and the curb continued
Party room interior; most of the electrical and plumbing rough-in work is complete
Party room bar (at north end of room)
Dining Room looking south to porch
Second floor hallway; purple temporary wall will be removed and open to the Grand Foyer / existing stair
South bedroom in the east addition